Document Pack – Risk – Safe Work Method Statement
Document Pack – Risk – Safe Work Method Statement

Document Pack – Risk – Safe Work Method Statement

$0.00 AUD

PK-RI-001

Description

The purpose of the Safe Work Method Statement Risk Pack is to provide a person in charge of a workplace activity, the basic tools to ensure associated risks with the activity are identified, documented and monitored. Documents include:
– PR-RI-001_00 Procedure – Safe Work Method Statement
– CP-RI-001_00 Inspection – Safe Work Method Statement
– FR-RI-009_00 Template – Safe Work Method Statement
– FR-RI-011_00 Register – Safe Work Method Statement

Great value and easy to use. All documents are immediately available.

Format: Work & Excel (Files Winzipped)

Document Pack - Risk - Safe Work Method Statement
$0.00 AUD