Safe Work Method Statement – Hammer Drill Use (Pneumatic)
Safe Work Method Statement – Hammer Drill Use (Pneumatic)

Safe Work Method Statement – Hammer Drill Use (Pneumatic)

$0.00 AUD

SW-SA-172

Description

This Safe Work Method Statement outlines the general requirements to undertake Pneumatic Hammer Drill activities in a safe and structured manner.

Job steps include pre-planning, training / competency, equipment, emergency response, specific job steps, monitoring, completion of task, demobilisation from work area and maintenance.

This Safe Work Method Statement utilises the AllSafety Risk Matrix and all activities are risk assessed based on the inherent and residual risk model.

This Safe Work Method Statements provides a basic outline of activity, potential hazards and recommended controls with provision to include activity specific requirements and personnel who are responsible for the review, approval and monitoring aspects of the activity.

Pages:  8 (1 x cover page, 1 x risk matrix and criteria, 5 x activity breakdown, 1 x sign on sheet).

Safe Work Method Statement - Hammer Drill Use (Pneumatic)
$0.00 AUD